GE Aviation CV

Carrickfergus, Antrim


  • GE Aviation

    Airbus



    Personal Details
    Telephone Number:   View Contact Details
    City:   Carrickfergus
    County:   Antrim
    Desired job title:   GE Aviation
    Salary:   £30001 - £40000
    Location:   Carrickfergus Antrim
    Education Level:   Certification
    Last Login:   about 8 months ago

    Normal

    More...

    Industries

    Aerospace Engineering Agriculture mechanical

    Job Titles

    Aircraft Engineer Aerospace Aircraft Maintenance Aerospace Quality Engineer Ranch Manager Fitter Structural fitter

    Skills

    Certificate of Basic Skills Training Certificate of Engineering Craftsmanship Driving Licence Driving__Licence__B MLG NLG

    Qualifications

    City & Guilds Basic Engineering NVQ Level 3 Engineering

    Employment History

    GE Aviation

    2015 - Present

    Employed as a structural fitter. Airbus detail section working on various airbus structural components & Hawk fuel cell


    Structural fitter

    2014 - 2015

    AW159 Future Lynx. Structural fitter. Worked on various jig stages of structural build and final fit out of Future Lynx.


    supervisor

    2006 - 2014

    MPI Price Team. Puma Chaff and Flare Mod. Lynx D1 / D2 supervisor of rectification Phase from 2008.Installation of Hydraulic systems and flying controls, ECU,s Tail Rotor Drive Shafts & Main/Tail Gear box. Supervised various working parties carrying out CSCVR modifications. Authorised MF700 second signature and carry out independent inspections. Chinook Flir Mod November 2011.Seaking March 2013 to July 2014. Supervisor of MPI Price team Rectification phase. Attend customer meetings to ensure aircraft deadlines and customer expectations are met.


    Sheet metal worker

    2006 - 2006


    Sheet metal worker

    2005 - 2005

    on A380 main fuselage Sheet metal worker/ mechanic. A320/320 & Boeing 737 C Checks


    Sheet metal worker

    2004 - 2005

    A320/320 & Boeing 737 C Checks Sheet metal worker/ mechanic. A320/330 C Checks. Service Bulletins, modifications and RIB 6 repair on A330.


    Aerospace

    2004 - 2005

    Sheet metal worker/ mechanic. A320/321 & Boeing 737 C Checks


    Sheet metal worker

    2004 - 2004

    Service bulletins & A Checks on Boeing 747


    2004 - 2004

    Service bulletins & A Checks on Boeing 747 Sheet metal worker/ mechanic. Boeing 747 D Checks Pylon & Leading edge Repairs


    Sheet metal worker

    2004 - 2004

    Boeing 747 D Checks Pylon & Leading edge Repairs Sheet metal worker/ mechanic. Service bulletins & A Checks on Boeing 747, Fokker 50 & Embraer 145


    Sheet metal worker

    2003 - 2003


    Sheet metal worker

    2003 - 2003

    Boeing 737 D Checks ------- Motorcycle repairs, frame straightening. Modifying, repairing & painting custom car repairs


    2003 - 2003


    2003 - 2003

    Boring 747 Section 41 zones 5 & 6. Completion of NRC,s


    Sheet metal worker

    2002 - 2002

    Sheet metal worker , Detailed components for Bombardier


    Aerospace

    2002 - 2002

    Sheet metal worker/ mechanic. A320 C Check


    Sheet metal worker

    2002 - 2002

    , Detailed components for Bombardier Shannon Aerospace Sheet metal worker, structural modifications & repairs on A320 & 737


    Sheet metal worker

    2002 - 2002

    structural modifications & repairs on A320 & 737 ------- Sheet metal worker, Detailed components for Bombardier, Rolls Royce and Bombardier


    2002 - 2002

    Boring 747 Section 41 zones 5 & 6. Completion of NRC,s & Snags


    worker

    2001 - 2001


    Aviation

    2001 - 2001

    Sheet matal worker. Floor Beam repairs on A300 Freighter Aviation Services Filton ------- A320 C Check. Cargo door removal & skin replacement. Structural repairs. Twin Bottle fire extinguisher modification including fitting of pipes & assisting avionics installation.


    2001 - 2001

    MPI Price Team. 727 freighter conversion. Floor beam reinforcement, seat track replacement, lap joints, cargo door cut out & installation.


    Aviation

    1999 - 2001

    MPI Price Team. A300 Freighter conversion. Structural reinforcement to sidewalls, over wing box, floor beams & shear plates. Lap Joint replacement IAW Airbus SRM & FSI. C Checks on Bae 146.


    1998 - 1999

    Boeing 757/767 C1 & C4 checks. Inspect Fuse, Empanage, MLG, NLG. Caryy out service bulletins on over wing escape. Skin repairs IAW SRM. Fuel leak repairs on 757/767 & MD11.


    1998 - 1998

    Boeing 707 C Check. Structural repairs including floor beam replacement & skin repairs.


    1998 - 1998

    DC 8 C Check. Fuel tank repair team, replacement of pipes, corrosion removal & leak repairs.


    1998 - 1998


    Sheet metal worker

    1998 - 1998


    Sheet metal worker

    1998 - 1998

    Passenger reconfiguration involving modification of air conditioning & fitting new structure for over head baggage.


    Aviation

    1998 - 1998

    Freighter conversion. Reinforcement of cargo bays & centre section.


    Aerospace

    1998 - 1998


    1997 - 1997


    Galaxy Aerospace

    1997 - 1997

    Corporation. Work as part of sheet metal team producing prototype business jet. Responsible for baggage bay, pylons fitting of skins & sub assemblies.


    1995 - 1997

    Canadair RJ Nacelles. Manufacture of Transcowl doors, Torque box & Thrust Reversers Stage 1 & 2. Final equipment & dispatch.


    1994 - 1995

    Shorts Missile Systems. Manufacture & testing of launch effect unit & various assemblies for Starburst & Starstreak missile systems.


    1993 - 1994

    V2500 Nacelle. Manufacture of Titanium bulkheads, fitting of carbon fibre skins & intake assemblies. Installation of De- Icing system.


    1990 - 1993

    Completed 3 year apprenticeship as an Aircraft fitter resulting in Certificate of Engineering Craftsmanship. Fokker 100. Manufacture of MLG Doors and Sub Assemblies. Boeing. Manufacture of carbon composite flaps & ailerons, stage 1 & 2 & Final Equip. Other Information. I pride myself on punctuality and reliability. Highly motivated with a professional attitude and work well under pressure. I currently hold a full clean driving licence and a valid passport. Telephone: 07809748493 02893 355021 E-Mail: johnbapgraham@hotmail.com


    Education History

    - 2006

    Education Title: professional

    Major: Lufthansa Resource Technical Training

    Description: Airbus Drawings & Worksheet System Structures


    Name of Institution: Airbus

    Education Title: Certificate of Basic Skills Training

    Major: Lufthansa Resource Technical Training

    Description: Certificate of Basic Skills Training - Mechanical Fitting & Assembly Lufthansa Resource Technical Training 80-T System Structures


    - 2006

    Education Title: professional

    Major: Airbus Technical Training

    Description: A380 Drilling CFK -Glare, Dent Scratch & Rivet Pulling, Airbus Sealant Guide Vector / Fleetlands Gosport MF700 Second Signature, Cat B Inspector, Independent Inspections, Manual Handling Training, Fire awareness Training, MIL Part 145, Conditioning, Overhead Crane Operator. Qualification


    - 2017

    Education Title: professional


    Name of Institution: Newtonabbey College

    Education Title: City & Guilds

    Major: Basic Engineering

    Description: NVQ Level 3 Engineering Manufacture - Craft Competence. City & Guilds - Basic Engineering Compentences. Industrial Studies. Basic Engineering Processes. Material Removal, Joining, Assembly & Dismantling. Mechanical production Processes. Science Background To Engineering.



    Personality Assessment data not available!


    GE Aviation CV Profile

    CURRICULM VITAE

     

    SURNAME:    ######                                                      

    FORENAME:  ####

    EXPERIENCE:

    ROTARY :                     FIXED WING:

    PUMA                            AIRBUS                 BOEING                   FOKKER 50, 100

    LYNX , ALL MKS           A380, 330             707, 727, 737         EMBRAER 145

    CHINOOK                      A320, A300          747, 757, 767         DC 8,  DC 10

    SEAKING ,                     CANADAIR RJ                                        MD 11, F 15

    TRAINING:

    HF                    

    EWIS                                                                                    Expires

    SFAR Fuel tank Safety Awareness Phase 1 & 2           26th  April  2017

    EASA 2042/2003 Part M  

    Engineering Training Council.                                   Completion Date:         June 1994  

    Certificate of Engineering Craftsmanship – H501 Common Core Skills (Fitting) H502 Fitting H502 Fitting.  H532 Aircraft System Sub Assemblies. H533 Aircraft Sub Assemblies. H534 Aircraft Major Assemblies. H542 Aircraft Final Erection & Functional Test. H551 Aircraft Components / Hydraulics Testing.

    Training & Employment Agency                               Completion Date:         February 1994

    Airframe Riveting Course – Safety, Reacting Solid Rivets, Rivet Identification, Blind Riveting.

    Shorts Brothers                                                            Completion Date:         September 1993

    Apprentice Fitter resulting in the Certificate of Engineering Craftsmanship.

    Engineering Training Council                                     Completion Date:         September 1991

    Certificate of Basic Skills Training – Mechanical Fitting & Assembly

    Lufthansa Resource Technical Training                   Completion Date:         January 2006

    Airbus 80-T System Structures

     

    Lufthansa Resource Technical Training                   Completion Date:         January 2006

    Airbus Drawings & Worksheet System Structures

    Airbus Technical Training                                           Completion Date:         July 2006

    A380 Drilling CFK –Glare, Dent Scratch & Rivet Pulling, Airbus Sealant Guide

    Vector / Fleetlands Gosport

    MF700 Second Signature, Cat B Inspector, Independent Inspections, Manual Handling Training, Fire awareness Training, MIL Part 145, Conditioning, Overhead Crane Operator.

    Qualification

    Newtonabbey College                                                  Completion Date:         June 1991

    City & Guilds – Basic Engineering Compentences. Industrial Studies. Basic Engineering Processes. Material Removal, Joining, Assembly & Dismantling. Mechanical production Processes. Science Background To Engineering.

    Newtonabbey College                                                  Completion Date:         June 1991

    City & Guilds – Basic Engineering Compentences.

    NVQ Level 3 Engineering Manufacture – Craft Competence.

    Employment History

    GE Aviation Hamble                                                     July 2015 to Present

    Employed as a structural fitter.  Airbus detail section working on various airbus structural components & Hawk fuel cell

    GKN Westlands                                                             August 2014 to May 2015

    AW159 Future Lynx.  Structural fitter. Worked  on various jig stages of structural build and final fit out of Future Lynx.

    DARA/ Vector Fleetlands                                            November 2006 to July 2014

    MPI Price Team.  Puma Chaff and Flare Mod. Lynx D1 / D2 supervisor of rectification Phase from 2008.Installation of Hydraulic systems and flying controls, ECU,s Tail Rotor Drive Shafts & Main/Tail Gear box.  Supervised various working parties carrying out CSCVR modifications. Authorised MF700 second signature and carry out independent inspections. Chinook Flir Mod  November 2011.Seaking March 2013 to July 2014. Supervisor of MPI Price team Rectification phase. Attend customer meetings to ensure aircraft deadlines and customer expectations are met.

    Airbus Toulouse                                                           January 2006 to November 2006    

    Sheet metal worker on A380 main fuselage

    LTU Munich                                                                   September 2005 to December 2005

    Sheet metal worker/ mechanic. A320/320 & Boeing 737 C Checks

    LTU Dusseldorf                                                             November 2004 to May 2005

    Sheet metal worker/ mechanic. A320/330 C Checks. Service Bulletins, modifications and RIB 6 repair on A330.

    Shannon Aerospace                                                     September 2004 to October 2005

    Sheet metal worker/ mechanic. A320/321 & Boeing 737 C Checks

     

    Cargolux Luxembourg                                                 March 2004 to August 2004

    Sheet metal worker/ mechanic. Service bulletins & A Checks on Boeing 747

    KLM                                                                                 February 2004

    Sheet metal worker/ mechanic. Boeing 747 D Checks Pylon & Leading edge Repairs

    Cargolux Luxembourg                                                 January 2004 to February 2004

    Sheet metal worker/ mechanic. Service bulletins & A Checks on Boeing 747, Fokker 50 & Embraer 145

    KLM                                                                                 December 2003  

    Sheet metal worker/ mechanic. Boeing 737 D Checks

    Bike Align NI                                                                  March 2003 to December 2003

    Motorcycle repairs, frame straightening. Modifying, repairing & painting custom car repairs

    SAA                                                                                  January 2003 to March 2003

    Boring 747 Section 41 zones 5 & 6. Completion of NRC,s  

    LTU Munich                                                                   January 2003

    Boeing 737 Mickey Mouse Mod

    Shannon Aerospace                                                     October 2002 to December 2002

    Sheet metal worker/ mechanic. A320 C Check

    SPS Aero Structures Ltd                                              October 2002

    Sheet metal worker , Detailed components for Bombardier

    Shannon Aerospace                                                     August 2002 to October 2002

    Sheet metal worker, structural modifications & repairs on A320 & 737

    SPS Aero Structures Ltd                                              April 2002 to May 2002

    Sheet metal worker, Detailed components for Bombardier, Rolls Royce and Bombardier

    Alsalam Aircraft Co Ltd                                               January 2002 to March 2002

    Boring 747 Section 41 zones 5 & 6. Completion of NRC,s  & Snags

    AMG Frankfurt                                                             November 2001

    Sheet matal worker. Floor Beam repairs on A300 Freighter

    Aviation Services Filton                                              September 2001 to November 2001

    A320 C Check. Cargo door removal & skin replacement. Structural repairs. Twin Bottle fire extinguisher modification including fitting of pipes & assisting avionics installation.

    FRA Bournmouth                                                          June 2001 to September 2001

    MPI Price Team. 727 freighter conversion. Floor beam reinforcement, seat track replacement, lap joints, cargo door cut out & installation.

    Aviation Services Filton                                              April 1999 to June 2001

    MPI Price Team. A300 Freighter conversion. Structural reinforcement to sidewalls, over wing box, floor beams & shear plates. Lap Joint replacement IAW Airbus SRM & FSI. C Checks on Bae 146.

    Condor Cargo Frankfurt                                              November 1998 to April 1999

    Boeing 757/767 C1 & C4 checks. Inspect Fuse, Empanage, MLG, NLG. Caryy out service bulletins on over wing escape. Skin repairs IAW SRM. Fuel leak repairs on 757/767 & MD11.

    Heavylift Southend Airport                                        October 1998 to November 1998

    Boeing 707 C Check. Structural repairs including floor beam replacement & skin repairs.

    Cargolux Luxembourg                                                 September 1998 to October 1998

    DC 8 C Check. Fuel tank repair team, replacement of pipes, corrosion removal & leak repairs.

    KLM                                                                                 July 1998 to August 1998

    Boeing 747 Section 41. Zones 1,4 & 9

    FLS Manchester                                                            June 1998 to July 1998

    Sheet metal worker on DC 10

    KLM                                                                                 May 1998 to June 1998

    Passenger reconfiguration involving modification of air conditioning & fitting new structure for over head baggage.

    Aviation Services Filton                                              February 1998 to April 1998

    Chevron Price Team. A300 Freighter conversion. Reinforcement of cargo bays & centre section.

    Shannon Aerospace                                                     January 1998 to February 1998

    Boeing 737 D check

    Israel Aircraft Industries Ltd                                      October 1997 to December 1997

    F-15 Conformal fuel tank assy.

    Israel Aircraft Industries Ltd                                      May 1997 to October 1997

    Galaxy Aerospace Corporation. Work as part of sheet metal team producing prototype business jet. Responsible for baggage bay, pylons fitting of skins & sub assemblies.

     

    Shorts Bros Plc                                                              September 1995 to May 1997

    Canadair RJ Nacelles. Manufacture of Transcowl doors, Torque box & Thrust Reversers Stage 1 & 2. Final equipment & dispatch.

    Shorts Bros Plc                                                              September 1994 to September 1995

    Shorts Missile Systems. Manufacture & testing of launch effect unit & various assemblies for Starburst & Starstreak missile systems.

    Shorts Bros Plc                                                              January 1993 to September 1994

    V2500 Nacelle. Manufacture of Titanium bulkheads, fitting of carbon fibre skins & intake assemblies. Installation of De- Icing system.

    Shorts Bros Plc                                                              September 1990 to September 1993

    Completed  3 year apprenticeship as an Aircraft fitter resulting in Certificate of Engineering Craftsmanship. Fokker 100. Manufacture of MLG Doors and Sub Assemblies. Boeing. Manufacture of carbon composite flaps & ailerons, stage 1 & 2 & Final Equip.

    Other Information.  

    I pride myself on punctuality and reliability. Highly motivated with a professional attitude and work well under pressure. I currently hold a full clean driving licence and a valid passport.          

    Telephone:   0##########

                          0###########

    E-Mail:  #########################

    Address: ###################

                     #############

                     N.Ireland

                     ########

     

     

    Enter text here...

    Download CV